Sign In | Join Free | My qualitytoyschina.com
China Shandong Tengfei Hoisting Engineering Co., Ltd. logo
Shandong Tengfei Hoisting Engineering Co., Ltd.
Shandong Tengfei Hoisting Engineering Co., Ltd.
Verified Supplier

1 Years

Home > Used Crawler Crane >

1.2 Km/H 220T Crawler Crane Xcmg In Heavy Machinery Handling And Improve Production Efficiency

Shandong Tengfei Hoisting Engineering Co., Ltd.
Trust Seal
Verified Supplier
Credit Check
Supplier Assessment
Contact Now

1.2 Km/H 220T Crawler Crane Xcmg In Heavy Machinery Handling And Improve Production Efficiency

Brand Name : XCMG

Model Number : XLC220

Place of Origin : China

MOQ : One Crane

Price : Negotiable Price

Payment Terms : L/C,T/T

Supply Ability : Supply According to Customer Needs

Delivery Time : According to Order Confirmation

Packaging Details : Packing According to Customer Requirements

Jib Angle : 15,30°

Operation Weight : 48.6 t

Jib Length : 60 meters

Maximum Gradeability : 30%

Weight : 24.6 t

Max Lifting Height : 93/106.5m

Max Boom Length : 13m-52m

Fly Jib Length : 13-25 m

Engine Rated Power : 242 /2100 kw/rpm

Gradeability : 30%

Max Travel Speed : 1.2 km/h

Condition : Used, in good working condition

Contact Now

220T Crawler Crane Can Play A Key Role In Heavy Machinery Handling And Improve Production Efficiency

XLC220 Crawler Crane Technical Specifications

Crawler crane models: XLC220
Max rated lifting capacity: 220t
Max lifting moment: 1239t.m

Typical working conditions

Main boom working condition_HBS/1_75t+21t main boom main hook performance with arm end pulley auxiliary hook

Operating radius(m)

Main boom length(m)

17

20

23

26

29

32

35

38

41

44

47

50

5

220.0

6

196.0

192.0

190.5

179.0

7

177.0

176.0

174.5

173.5

167.0

156.0

144.0

8

154.5

154.0

153.5

151.9

147.3

144.7

138.2

127.0

115.0

103.0

9

136.0

136.0

135.2

133.4

131.0

127.0

124.0

121.0

109.0

103.0

101.0

10

115.0

115.0

116.0

116.0

115.0

112.0

110.0

107.0

105.0

102.0

99.0

91.0

12

87.5

87.9

88.2

88.3

88.4

88.4

88.4

87.2

85.5

83.8

82.2

80.6

14

69.7

70.2

70.5

70.6

70.7

70.7

70.6

70.6

70.5

70.3

69.1

67.8

16

57.4

58.0

58.3

58.4

58.5

58.5

58.4

58.3

58.3

58.1

58.0

57.9

18

49.0

49.3

49.5

49.6

49.5

49.5

49.4

49.3

49.2

49.1

48.9

20

42.5

42.6

42.7

42.7

42.7

42.6

42.5

42.4

42.2

42.1

22

37.2

37.4

37.3

37.3

37.2

37.1

37.0

36.9

36.7

24

32.8

33.0

33.0

33.0

32.9

32.8

32.6

32.5

32.3

26

29.3

29.4

29.4

29.3

29.2

29.1

28.9

28.7

28

26.3

26.3

26.2

26.2

26.0

25.9

25.7

30

23.7

23.7

23.6

23.5

23.3

23.1

32

21.5

21.4

21.4

21.2

21.1

20.9

34

19.5

19.4

19.3

19.2

19.0

36

17.7

17.6

17.4

17.3

38

16.0

15.9

15.8

40

14.7

14.6

14.4

42

13.3

13.2

44

12.1

Magnification

18

18

16

14

13

12

11

10

9

9

8

8

Notes:

1.When the main boom length exceeds 71m, the waist rope must be used for the combination at the "*" position. When the main boom length exceeds 74m, it is recommended to use an inclined wedge to assist in raising the boom.

2.The tower arm rear pull plate must be removed from each boom section, and the tower arm guide pulley must be removed from the top section of the main boom.

Main boom working condition_HBS/1_75t+21t main boom main hook performance with arm end pulley auxiliary hook

Operating radius(m)

Main boom length(m)

53

56

59

62

65

68

71*

74*

77*

80*

83*

10

85.4

81.5

78.5

68.5

12

79.4

77.9

76.4

66.5

65.5

62.6

60.2

55.0

14

67.0

65.8

64.6

63.5

62.3

60.5

58.5

53.5

48.8

44.6

40.8

16

57.6

56.6

55.7

54.7

53.8

53.0

52.0

51.3

47.4

43.3

39.7

18

49.1

48.9

48.7

47.8

47.0

46.4

45.5

44.9

44.1

42.1

38.5

20

42.2

42.1

41.9

41.7

41.5

41.0

40.2

39.8

39.0

38.5

37.4

22

36.8

36.7

36.5

36.3

36.1

36.0

35.8

35.4

34.8

34.3

33.7

24

32.5

32.3

32.1

31.9

31.7

31.7

31.4

31.4

31.2

30.8

30.2

26

28.9

28.7

28.5

28.3

28.1

28.0

27.8

27.8

27.5

27.4

27.2

28

25.9

25.7

25.5

25.3

25.1

25.0

24.7

24.7

24.5

24.4

24.1

30

23.3

23.1

22.9

22.7

22.5

22.4

22.2

22.1

21.9

21.8

21.5

32

21.1

20.9

20.7

20.5

20.3

20.2

19.9

19.9

19.7

19.6

19.3

34

19.1

19.0

18.8

18.6

18.4

18.3

18.0

18.0

17.7

17.6

17.4

36

17.4

17.3

17.1

16.9

16.7

16.6

16.3

16.3

16.0

15.9

15.7

38

15.9

15.8

15.6

15.4

15.1

15.0

14.8

14.8

14.5

14.4

14.2

40

14.6

14.4

14.2

14.0

13.8

13.7

13.4

13.4

13.2

13.0

12.8

42

13.4

13.2

13.0

12.8

12.6

12.5

12.2

12.2

12.0

11.8

11.6

44

12.3

12.1

11.9

11.7

11.5

11.4

11.1

11.1

10.9

10.7

10.5

46

11.2

11.1

10.9

10.7

10.5

10.4

10.1

10.1

9.9

9.8

9.5

48

10.2

10.0

9.8

9.6

9.5

9.2

9.2

9.0

8.8

8.6

50

9.3

9.2

9.0

8.8

8.7

8.4

8.4

8.1

8.0

7.8

52

8.4

8.2

8.0

7.9

7.6

7.6

7.4

7.3

7.0

54

7.5

7.3

7.2

6.9

6.9

6.7

6.6

6.3

56

6.6

6.5

6.3

6.3

6.0

5.9

5.7

58

6.0

5.9

5.7

5.7

5.4

5.3

5.1

60

5.3

5.1

5.1

4.9

4.7

4.5

62

4.6

4.6

4.3

4.2

4.0

64

4.1

3.8

3.7

3.5

66

3.6

3.4

3.3

3.0

68

2.9

2.8

2.6

70

2.4

2.2

Magnification

7

6

6

6

5

5

5

4

4

4

4

Notes:

1.When the main boom length exceeds 71m, the waist rope must be used for the combination at the "*" position. When the main boom length exceeds 74m, it is recommended to use an inclined wedge to assist in raising the boom.

2.The tower arm rear pull plate must be removed from each boom section, and the tower arm guide pulley must be removed from the top section of the main boom.


Product Tags:

220t crawler crane xcmg

      

220t xcmg crawler crane

      

1.2 km/h crawler crane xcmg

      
Quality 1.2 Km/H 220T Crawler Crane Xcmg In Heavy Machinery Handling And Improve Production Efficiency wholesale

1.2 Km/H 220T Crawler Crane Xcmg In Heavy Machinery Handling And Improve Production Efficiency Images

Inquiry Cart 0
Send your message to this supplier
 
*From:
*To: Shandong Tengfei Hoisting Engineering Co., Ltd.
*Subject:
*Message:
Characters Remaining: (0/3000)